{"id":7176,"date":"2023-05-30T20:12:45","date_gmt":"2023-05-30T20:12:45","guid":{"rendered":"https:\/\/axxessintl.com\/vancouver-increases-container-throughput-at-dp-world-terminal\/"},"modified":"2023-05-30T20:21:44","modified_gmt":"2023-05-30T20:21:44","slug":"vancouver-increases-container-throughput-at-dp-world-terminal","status":"publish","type":"post","link":"https:\/\/axxessintl.com\/en\/vancouver-increases-container-throughput-at-dp-world-terminal\/","title":{"rendered":"Vancouver Increases Container Throughput at DP World Terminal"},"content":{"rendered":"<p>Vancouver Fraser Port Authority joined with terminal operator DP World to mark the completion of a major expansion project at one of the port\u2019s terminals. The increased capacity is considered critical to the near-term growth of the port while Vancouver continues a long-term process to add a third terminal and operator to the port.<!--more--><\/p>\n<p>The expansion project was designed to increase throughput at the terminal by 60 percent. Construction on the US$260 million project was completed in February 2023 and, with the facilities now in operation, capacity has been increased to 1.5 million TEU a year, 40 percent over the previous capacity of 600,000 TEU annually. The terminal\u2019s footprint was increased by 15 percent.<\/p>\n<p>Read more in an <a href=\"https:\/\/ciffa.apms5.com\/anywhere\/m?s=ciffa&amp;m=s_f8661a43-a969-43a4-ac55-2ef7ed4200b5&amp;u=e1jq4wvfdtfm8dhg6n1k4hj45n2mad255mu36ha25n13ada35mt3jc1m6rtm8cj370uk8&amp;r2=d1u78w3k78qjyxvqewq6urbjd5u6jvb55njqgtb3enu6jxk55thpyv9fc5t78ub3dhjjyxk1dthpyxbpcnt2uubecdt6arbkcntjurvfdtu62ubecnt2ux38e9qqatv8e1uq8bb1egpp8w1dexqq4v345nu6awkdd5q62v1zenu6uqv3c5pq0rb9cxq3uta2enp6rtbmd5q5ychk60uk4d96enu6uqvdcnj6jxbd7njpurb9dgk7ax3dbxtpyxbjcdjkurbnehqq0ubcdxu0&amp;n=6\">article from The Maritime Executive<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vancouver Fraser Port Authority joined with terminal operator DP World to mark the completion of a major expansion project at one of the port\u2019s terminals. The increased capacity is considered critical to the near-term growth of the port while Vancouver continues a long-term process to add a third terminal and operator to the port.<\/p>\n","protected":false},"author":15,"featured_media":3129,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56,655],"tags":[453],"types-de-nouvelles":[],"class_list":["post-7176","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-news","category-transport-international-en","tag-dp-world-en"],"_links":{"self":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/7176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/comments?post=7176"}],"version-history":[{"count":2,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/7176\/revisions"}],"predecessor-version":[{"id":7183,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/7176\/revisions\/7183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/media\/3129"}],"wp:attachment":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/media?parent=7176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/categories?post=7176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/tags?post=7176"},{"taxonomy":"types-de-nouvelles","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/types-de-nouvelles?post=7176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}