{"id":9939,"date":"2024-07-16T17:31:43","date_gmt":"2024-07-16T17:31:43","guid":{"rendered":"https:\/\/axxessintl.com\/port-of-montreal-completes-rail-optimization-project\/"},"modified":"2024-07-16T17:32:18","modified_gmt":"2024-07-16T17:32:18","slug":"port-of-montreal-completes-rail-optimization-project","status":"publish","type":"post","link":"https:\/\/axxessintl.com\/en\/port-of-montreal-completes-rail-optimization-project\/","title":{"rendered":"Port of Montreal Completes Rail Optimization Project"},"content":{"rendered":"<p>The Montreal Port Authority (MPA) has completed its extensive project to optimize rail capacity, a flagship project to improve the performance and fluidity of its logistics services. Phased in over three years at a total cost of $62.4 million, this ambitious project that extends from Bourbonni\u00e8re Avenue to Panet Street, near the Jacques-Cartier Bridge, signals a major increase in the Port of Montreal&#8217;s rail capacity.<!--more--><\/p>\n<p>Through the project, the MPA installed two new tracks totalling 6 km of additional track and six switches to serve the 14 terminals and relocated the Port Road and all related infrastructure (sewer, water supply, power and telecom networks, etc.).<\/p>\n<p>Read more in a <a href=\"https:\/\/www.port-montreal.com\/en\/the-port-of-montreal\/news\/news\/press-release\/rail-capacity-optimization-project\">press release from the Port of Montreal<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Montreal Port Authority (MPA) has completed its extensive project to optimize rail capacity, a flagship project to improve the performance and fluidity of its logistics services. Phased in over three years at a total cost of $62.4 million, this ambitious project that extends from Bourbonni\u00e8re Avenue to Panet Street, near the Jacques-Cartier Bridge, signals [&hellip;]<\/p>\n","protected":false},"author":15,"featured_media":9937,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56],"tags":[275,1236],"types-de-nouvelles":[],"class_list":["post-9939","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-news","tag-montreal-port-authority-en","tag-mpa-en"],"_links":{"self":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/9939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/comments?post=9939"}],"version-history":[{"count":1,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/9939\/revisions"}],"predecessor-version":[{"id":9940,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/posts\/9939\/revisions\/9940"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/media\/9937"}],"wp:attachment":[{"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/media?parent=9939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/categories?post=9939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/tags?post=9939"},{"taxonomy":"types-de-nouvelles","embeddable":true,"href":"https:\/\/axxessintl.com\/en\/wp-json\/wp\/v2\/types-de-nouvelles?post=9939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}